Main Street at High Street ImprovementProject

Goldstein high intersection

Project Description: 

Preliminary engineering and construction contracts for infrastructure improvements along High and West Main Streets.

Project Background: 

In 2019, the Council directed staff to study this area and identify potential improvements.  Sungate Design Group has completed a study which identifies two alternatives.  The first redirects some of the runoff from High Street, all of which currently flows down along Goldston Drive, to West Main Street, thereby reducing the impacts along and downstream of Goldston Drive. The second alternative pursues further improvements along and downstream of Goldston Drive, with a good deal of required improvements entirely on private property.

The Town is moving forward with Alternative 1 at this time since a) this alternative is less expensive and Enterprise funds are immediately available; and b) the improvements are relatively straightforward and do not require the much more extensive and complex coordination with private property owners.  

Staff have reviewed the study with NCDOT since the improvements would direct more water to the West Main Street underground stormwater infrastructure, and determined that the West Main system is adequately sized and in suitable condition to accept the additional drainage. If approved, engineering work is planned for this summer and construction work would be bid and pursued in the fall. 

Follow this page for updates on project status as they become available.

Project details are preliminary and subject to change.